Plan · Sanitation and waste · Sai Layout, Bengaluru (GBA), Bengaluru Urban, Karnataka
AcknowledgedDesilt and connect the Sai Layout stormwater drain before the monsoon
From 1 postUpdated 25 Oct 2026
- Proposed
- Reviewed
- Funded
- In progress
- Done
13/15
The one-pager
- Problem
- The stormwater drain behind 4th Cross has not been desilted for over a year. In the May rains it overflowed within an hour and water entered about 30 homes.
- Who is affected
- About 30 households on 4th and 5th Cross, and the anganwadi on the corner.
- Options considered
- Desilt the 600 m stretch and add a silt trap (14 votes); widen the railway culvert (9 votes).
- Proposed solution
- Desilt the full stretch by April, add a silt trap at the market junction, and request the railway culvert study in parallel.
- Who can implement
- Ward office, Sai Layout, with the stormwater drains division.
- Rough cost and funding routes
- Desilting is routine ward maintenance. The silt trap is a small works item.
Posts behind this plan
Status history
Proposed · 9 Oct 2026
Drafted from residents' posts and the chapter's drain walk.
Acknowledged · 17 Oct 2026
Ward engineer visited and agreed to schedule desilting.